Gas-Electric Phase
The Gas-Electric System Interface Study ran from 2013-2014 and is an extension of the original Phase II Scope. The four targets of the work are:
- A baseline assessment 
- Evaluation of systems capability to supply 
- Analyze contingencies 
- Dual-fuel analysis 
You can access subfolders for the Gas-Electric section by navigating the links below.
