Phase II Modeling Results

Production Cost Results (Task 9)

EIPC Production Cost Output Files Framework
Summary Tables 1-3_V2 (10-08-12)
Task 9 Overview_11-13-12


Scenario 1
Scen 1 Base A Gen Report_V4 (11-14-12) 
Scen 1 Base B Trans Report V2 (10-08-12) 
Scen 1 Hourly E Trans Report V2 (10-08-12)
Scen 1 Hourly F Gen Report V2 (10-08-12)
S1 Wind Curtailment Scatter Plot  
S1 Wind Curtailment Data by NEEM Region  
Maps S1 of Ave. Load & LMP 
Scen 1 Preliminary Gen Hourly Plot_ORNL
Scen 1 MISO Wind Curtailment_Preliminary


Scenario 2
Scen 2 Base A Gen Report V3 (10-08-12)
Scen 2 Base B Trans Report V2
Scen 2 Hourly E Trans Report
Scen 2 Hourly F Gen Report
Scen 2 Hourly Gen Summary_MW_ORNL
Scen 2 Hourly Gen Summary_Percent_ORNL

Scenario 3
Scen 3 Base A Gen Report V3 (10-08-12) 
Scen 3 Base B Trans Report_V2 (10-01-12)
Scen 3 E Hourly Trans Report_V2  (10-01-12)
Scen 3 F Hourly Gen Report_V2 (10-01-12)
Scen 3 F Hourly Gen Plots_V2_ORNL (10-03-12) 


Sensitivities


Sensitivities Results Summary 11-13-12
Sensitivities S1 & S3 High Gas Summary 11-05-12


Scenario 1 Reduced Wind Sensitivity
A - Generation Report 
B - Transmission Report 
E - Hourly Transmission Report 
F - Hourly Generation Report 
  
Scenario 1 High Spin Availability Sensitivity
A - Annual Generation Report
B - Annual Transmission Report
E - Hourly Trans Report
F - Hourly Gen Report

Scenario 1 Flowgate Relief Sensitivity
A - Annual Generation Report
B - Annual Transmission Report
E - Hourly Trans Report
F - Hourly Gen Report

Scenario 3 High Natural Gas Price Sensitivity
A - Annual Generation Report
B - Annual Transmission Report
E - Hourly Trans Report 
F - Hourly Gen Report

Scenario 3 High Load Sensitivity
A - Annual Generation Report
B - Annual Transmission Report
E - Hourly Trans Report
F - Hourly Gen Report

Scenario 1 High Load Sensitivity
A - Annual Generation Report
B - Annual Transmission Report
E - Hourly Trans Report
F - Hourly Gen Report

NGO Comments on Phase II Results




Load Flow Modeling Results (Task 7)

Same for all Scenarios and Blocks:
Contingency file 
Monitor file
Procedures for Assessing Transfers 
Conversion to Thermal Loadings
 

Scenario 1
Scenario 1, Block 1, Pass 1, Ancillary Files
List of Initial Constraints
Subsystem file
Transfer Amount for Initial Analysis
Scenario 1, Block 1, Pass 2, Ancillary Files
List of Constraints
Subsystem file (corrected 4-5-12)
Transfer Amount

Scenario 1, Block 13, Pass 1, Ancillary Files
List of Initial Constraints
Subsystem file
Transfer Amount for Initial Analysis
Scenario 1, Block 13, Pass 2, Ancillary Files
List of Constraints
Subsystem file (corrected 4-5-12) 
Transfer Amount

Scenario 1, Pass 3 Ancillary Files
List of Constraints
Updated List of Constraints, inc. 161 kV lines
Subsystem file

Map for S1 Working Solutions
Updated Map for S1 and S3 Solutions
Constraints with DC Line Removals
S1 and S3 Solutions
Updated Constraints with DC Line Removals (+S1B13)
S1 and S3 Solutions

Scenario 1, Pass 4 Ancillary Files 
List of Constraints (v2)
Subsystem file: same as above, Pass 3

Scenario 2
Scenario 2, Pass 1 Ancillary Files
Initial List of Constraints
AC Analysis Subsystem File

Scenario 3
Scenario 3, Block 1, Pass 1, Ancillary Files
List of Constraints
Updated List of Constraints, inc. 161 kV lines
Subsystem file

Scenario 3, Block 1, Pass 2, Ancillary Files 
List of Constraints
Subsystem file: same as above, Pass 1

Reliability Tests Results (Task 8)

Scenario 1
Initial Constraints 

Scenario 2
Initial Constraints

Scenario 3
Initial Constraints


Transmission Topography with all facilities from Tasks 7 & 8:
Scenario Solutions (with Cost Estimates- from Task 10)
Map of Solutions 
Legend for Map Layers
Finalized Map of Solutions (updated 11-27-12)

Inter-Regional Flowgates
Supplemental Flowgates

Generation Cost Estimates (Task 10)
Transmission Cost Estimate Matrices (Task 10)